In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy.
This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.
Constraints List |
USRN: 27500944 Road Class:Q Ownership: Private |
Burrington Radar Safeguard Area consultation required for: All buildings, structures, erections & works exceeding 45 metres in height. |
Within:Braunton Burrows, SAC 10KM Buffer if agricultural development consider need for AQIA |
Landscape Character is: 7 Main Cities and Towns |
Within Adopted Unesco Biosphere Transition (ST14) |
Chivenor Safeguard Zone Consultation Structure or works exceeding 91.4m |
County Highway Development Officer:Matt Collins email:matthew.collins@devon.gov.uk |
Within:, SSSI 5KM Buffer in North Devon,consider need for AQIA if proposal is for anaerobic digester without combustion plant |
SSSI Impact Risk Consultation Requirement:,Infrastucture:Pipelines, pylons and overhead cables. Any transport proposal including road, rail and by water (excluding routine maintenance). Airports, helipads and other aviation proposals.,Wind/Solar:Solar schemes with footprint > 0.5ha, all wind turbines.,Minerals/Oil/Gas:Planning applications for quarries, including: new proposals, Review of Minerals Permissions (ROMP), extensions, variations to conditions etc. Oil & gas exploration/extraction., Rural Non Residential:Large non residential developments outside existing settlements/urban areas where net additional gross internal floorspace is > 1,000m² or footprint exceeds 0.2ha.,Residential:Residential development of 50 units or more.,Rural Residential:Any residential development of 10 or more houses outside existing settlements/urban areas.,Air Pollution:Any industrial/agricultural development that could cause AIR POLLUTION (incl: industrial processes, livestock & poultry units with floorspace > 500m², slurry lagoons > 200m² & manure stores > 250t).,Combustion:General combustion processes >20MW energy input. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion.,Waste:Landfill. Incl: inert landfill, non-hazardous landfill, hazardous landfill.,Compost:Any composting proposal with more than 75000 tonnes maximum annual operational throughput. Incl: open windrow composting, in-vessel composting, anaerobic digestion, other waste management.,Water SupplyAny discharge of water or liquid waste of more than 5m³/day to ground (ie to seep away) or to surface water, such as a beck or stream (NB This does not include discharges to mains sewer which are unlikely to pose a risk at this location). |
Tree Preservation Order: 3 - A1, Fort Hill House, Barnstaple |
Advert Control Area Barnstaple |
Within Braunton Burrows Zone of Influence |
Planning Officer Area: North Team |