In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy.
This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.
Constraints List |
County Highway Development Officer:Paul Young email:paul.young@devon.gov.uk |
Landscape Character is: 5C Downland |
Planning Officer Area: North Team |
Adjacent to Conservation Area: 15 Georgeham Adopted 11/05/2010; |
Advert Control Area Area of Special Advert Control |
Conservation Area: 15 Georgeham Adopted 11/05/2010; |
Chivenor Safeguard Zone Consultation Struture or works exceeding 45.7m |
Within:Braunton Burrows, SAC 10KM Buffer if agricultural development consider need for AQIA |
Within:, SSSI 5KM Buffer in North Devon,consider need for AQIA if proposal is for anaerobic digester without combustion plant |
SSSI Impact Risk Consultation Requirement:All planning applications (except householder) outside or extending outside existing settlements/urban areas affecting greenspace, farmland, semi natural habitats or landscape features such as trees, hedges, streams, rural buildings/structures.,Infrastucture:Airports, helipads and other aviation proposals.,Wind/Solar:Solar schemes with footprint > 0.5ha, all wind turbines.,Minerals/Oil/Gas:Planning applications for quarries, including: new proposals, Review of Minerals Permissions (ROMP), extensions, variations to conditions etc. Oil & gas exploration/extraction., Rural Non Residential:,Residential:,Rural Residential:,Air Pollution:Any industrial/agricultural development that could cause AIR POLLUTION (incl: industrial processes, livestock & poultry units with floorspace > 500m², slurry lagoons > 200m² & manure stores > 250t).,Combustion:General combustion processes >20MW energy input. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion.,Waste:Landfill. Incl: inert landfill, non-hazardous landfill, hazardous landfill.,Compost:Any composting proposal with more than 75000 tonnes maximum annual operational throughput. Incl: open windrow composting, in-vessel composting, anaerobic digestion, other waste management.,Water Supply |
SSSI Impact Risk Consultation Requirement:All planning applications (except householder) outside or extending outside existing settlements/urban areas affecting greenspace, farmland, semi natural habitats or landscape features such as trees, hedges, streams, rural buildings/structures.,Infrastucture:Pipelines, pylons and overhead cables. Any transport proposal including road, rail and by water (excluding routine maintenance). Airports, helipads and other aviation proposals.,Wind/Solar:Solar schemes with footprint > 0.5ha, all wind turbines.,Minerals/Oil/Gas:Planning applications for quarries, including: new proposals, Review of Minerals Permissions (ROMP), extensions, variations to conditions etc. Oil & gas exploration/extraction., Rural Non Residential:Large non residential developments outside existing settlements/urban areas where footprint exceeds 1ha.,Residential:,Rural Residential:Any residential development of 50 or more houses outside existing settlements/urban areas.,Air Pollution:Any industrial/agricultural development that could cause AIR POLLUTION (incl: industrial processes, livestock & poultry units with floorspace > 500m², slurry lagoons > 200m² & manure stores > 250t).,Combustion:General combustion processes >20MW energy input. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion.,Waste:Landfill. Incl: inert landfill, non-hazardous landfill, hazardous landfill.,Compost:Any composting proposal with more than 75000 tonnes maximum annual operational throughput. Incl: open windrow composting, in-vessel composting, anaerobic digestion, other waste management.,Water Supply |
Within Adopted AONB (ST09 & ST14) |
Within Adopted Coast and Estuary Zone |
Within adopted Development Boundary: Georgeham Development Boundary ST07 |
Within 100m of Adopted Heritage Coast |
Within Adopted Unesco Biosphere Transition (ST14) |
Within Braunton Burrows Zone of Influence |
USRN: 27500125 Road Class:C Ownership: Highway Authority |
Listed Building Adjacent: 169 EH Ref 1162407 Speedwell House and adjoining outbuilding to west, Netherham's Hill, Georgeham |
USRN: 27500213 Road Class:C Ownership: Highway Authority |
USRN: 27506681 Road Class:C Ownership: Highway Authority |
Listed Building Curtilage (Adjacent to) |