In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy.
This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.
Constraints List |
Planning Officer Area: North Team |
Burrington Radar Safeguard Area consultation required for: All buildings, structures, erections & works exceeding 45 metres in height. |
Landscape Character is: 3C Sparsely Settled Farmed Valley Floors |
Landscape Character is: 7 Main Cities and Towns |
County Highway Development Officer:Matt Collins email:matthew.collins@devon.gov.uk |
Advert Control Area Area of Special Advert Control |
Land is potentially contaminated, site was used for:Factory or works - use not specified, Is ranked:MEDIUM, Year:1992 |
Chivenor Safeguard Zone Consultation Struture or works exceeding 45.7m |
Within:Braunton Burrows, SAC 10KM Buffer if agricultural development consider need for AQIA |
Within:, SSSI 5KM Buffer in North Devon,consider need for AQIA if proposal is for anaerobic digester without combustion plant |
SSSI Impact Risk Consultation Requirement:,Infrastucture:Pipelines, pylons and overhead cables. Any transport proposal including road, rail and by water (excluding routine maintenance). Airports, helipads and other aviation proposals.,Wind/Solar:Solar schemes with footprint > 0.5ha, all wind turbines.,Minerals/Oil/Gas:Planning applications for quarries, including: new proposals, Review of Minerals Permissions (ROMP), extensions, variations to conditions etc. Oil & gas exploration/extraction., Rural Non Residential:,Residential:Residential development of 50 units or more.,Rural Residential:Any residential development of 10 or more houses outside existing settlements/urban areas.,Air Pollution:,Combustion:General combustion processes >20MW energy input. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion.,Waste:Landfill. Incl: inert landfill, non-hazardous landfill, hazardous landfill.,Compost:Any composting proposal with more than 500 tonnes maximum annual operational throughput. Incl: open windrow composting, in-vessel composting, anaerobic digestion, other waste management.,Water Supply |
Within Surface Water 1 in 100 |
Within Surface Water 1 in 1000 |
Within adopted Development Boundary: Barnstaple North Development Boundary ST06 |
Within Adopted Housing Allocation: BAR06 South of North Devon Hospital |
Within Adopted Unesco Biosphere Transition (ST14) |
Within Braunton Burrows Zone of Influence |
USRN: 27505362 Road Class:YFP Ownership: Highway Authority |
Public Right of Way:Footpath 204FP26 |
USRN: 27501049 Road Class:A Ownership: Highway Authority |
Land is potentially contaminated with:Tanks |
Unclassified Road |
Class I Road |