In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy.
This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.
Constraints List |
Chivenor Safeguard Zone Consultation Struture or works exceeding 45.7m |
Advert Control Area Area of Special Advert Control |
Within Flood Zone 2 |
Within Flood Zone 3 |
Landscape Character is: 3A Upper Farmed & Wooded Valley Slopes |
Burrington Radar Safeguard Area consultation required for: All buildings, structures, erections & works exceeding 15 metres in height. |
Conservation Area: 19 Instow Adopted 01/01/2013; |
Planning Officer Area: South Team |
Within:Braunton Burrows, SAC 10KM Buffer if agricultural development consider need for AQIA |
Within:, SSSI 500M Buffer in Torridge,consider need for AQIA if proposal is for anaerobic digester without combustion plant |
Within:, SSSI 500M Buffer in North Devon,consider need for AQIA if proposal is for anaerobic digester without combustion plant |
Within:, SSSI 5KM Buffer in North Devon,consider need for AQIA if proposal is for anaerobic digester without combustion plant |
SSSI Impact Risk Consultation Requirement:ALL PLANNING APPLICATIONS - EXCEPT HOUSEHOLDER APPLICATIONS.,Infrastucture:,Wind/Solar:,Minerals/Oil/Gas:, Rural Non Residential:,Residential:,Rural Residential:,Air Pollution:,Combustion:,Waste:,Compost:,Water Supply |
SSSI Impact Risk Consultation Requirement:All planning applications (except householder) outside or extending outside existing settlements/urban areas affecting greenspace, farmland, semi natural habitats or landscape features such as trees, hedges, streams, rural buildings/structures.,Infrastucture:Pipelines, pylons and overhead cables. Any transport proposal including road, rail and by water (excluding routine maintenance). Airports, helipads and other aviation proposals.,Wind/Solar:Solar schemes with footprint > 0.5ha, all wind turbines.,Minerals/Oil/Gas:Planning applications for quarries, including: new proposals, Review of Minerals Permissions (ROMP), extensions, variations to conditions etc. Oil & gas exploration/extraction., Rural Non Residential:,Residential:Residential development of 10 units or more.,Rural Residential:Any residential developments outside of existing settlements/urban areas with a total net gain in residential units.,Air Pollution:,Combustion:General combustion processes >20MW energy input. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion.,Waste:Landfill. Incl: inert landfill, non-hazardous landfill, hazardous landfill.,Compost:Any composting proposal with more than 75000 tonnes maximum annual operational throughput. Incl: open windrow composting, in-vessel composting, anaerobic digestion, other waste management.,Water SupplyAny discharge of water or liquid waste that is discharged to ground (ie to seep away) or to surface water, such as a beck or stream (NB this does not include discharges to mains sewer which are unlikely to pose a risk at this location). |
Within Adopted Coast and Estuary Zone |
Within adopted Development Boundary: Instow Development Boundary ST07 |
Within Adopted Unesco Biosphere Transition (ST14) |
Within Braunton Burrows Zone of Influence |
Class III Road |