In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy.
This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.
Constraints List |
Listed Building: 3780 EH Ref 1107147 Stables and Granary 5 metres north-west of Northcote Farmhouse, East Down |
Within:Exmoor Heaths, SAC 10KM Buffer if agricultural development consider need for AQIA |
Listed Building Adjacent: 3780 EH Ref 1107147 Stables and Granary 5 metres north-west of Northcote Farmhouse, East Down |
Planning Officer Area: North Team |
Advert Control Area Area of Special Advert Control |
Listed Building Adjacent: 3047 EH Ref 1107146 Northcote Farmhouse and Northcote Farm Cottage, East Down |
Landscape Character is: 5C Downland |
Listed Building Curtilage (within) |
Listed Building Curtilage (Adjacent to) |
Public Right of Way:Footpath 224FP15 |
Public Right of Way:Footpath 224FP16 |
USRN: 27505671 Road Class:YFP Ownership: Highway Authority |
USRN: 27505672 Road Class:YFP Ownership: Highway Authority |
USRN: 27504597 Road Class:Q Ownership: Private |
County Highway Development Officer:Paul Young email:paul.young@devon.gov.uk |
Listed Building: 3047 EH Ref 1107146 Northcote Farmhouse and Northcote Farm Cottage, East Down |
Within:Exmoor and Quantock Oakwoods, SAC 10KM Buffer if agricultural development consider need for AQIA |
Within:, SSSI 5KM Buffer in North Devon (Exmoor NP),consider need for AQIA if proposal is for anaerobic digester without combustion plant |
Within:, SSSI 5KM Buffer in NorthDevon,consider need for AQIA if proposal is for anaerobic digester without combustion plant |
SSSI Impact Risk Consultation Requirement:,Infrastucture:Airports, helipads and other aviation proposals.,Wind/Solar:,Minerals/Oil/Gas:Oil & gas exploration/extraction., Rural Non Residential:,Residential:,Rural Residential:,Air Pollution:,Combustion:General combustion processes >20MW energy input. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion.,Waste:Landfill. Incl: inert landfill, non-hazardous landfill, hazardous landfill.,Compost:Any composting proposal with more than 75000 tonnes maximum annual operational throughput. Incl: open windrow composting, in-vessel composting, anaerobic digestion, other waste management.,Water Supply |
SSSI Impact Risk Consultation Requirement:,Infrastucture:Airports, helipads and other aviation proposals.,Wind/Solar:,Minerals/Oil/Gas:Oil & gas exploration/extraction., Rural Non Residential:,Residential:,Rural Residential:,Air Pollution:,Combustion:General combustion processes >50MW energy input. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion.,Waste:,Compost:,Water Supply |
Within Adopted Unesco Biosphere Transition (ST14) |