In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy.
This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.
Constraints List |
Chivenor Safeguard Zone Consultation Struture or works exceeding 45.7m |
Within:Exmoor Heaths, SAC 10KM Buffer if agricultural development consider need for AQIA |
Ancient Woodland: NORTHFIELD WOOD Ancient & Semi-Natural Woodland |
Adjacent to Conservation Area: 6 Berrynarbor Adopted 01/02/2011; |
Listed Building: 3141 EH Ref 1325722 Drinking fountain at junction with Mill Lane, Berrynarbour |
Listed Building Adjacent: 3141 EH Ref 1325722 Drinking fountain at junction with Mill Lane, Berrynarbour |
Landscape Character is: 4C Coastal Slopes and Combes with Settlement |
Non Mains Drainage Site: 48468 |
Non Mains Drainage Site: 43610 |
Public Right of Way:Footpath 205FP23 |
Article 4 Area: Combe Martin and Berrynarbor |
Historic Landfill Buffer |
Planning Officer Area: North Team |
County Highway Development Officer:Paul Young email:paul.young@devon.gov.uk |
USRN: 27500553 Road Class:C Ownership: Highway Authority |
Advert Control Area Area of Special Advert Control |
Land is potentially contaminated, site was used for:General quarrying, Is ranked:LOW, Year:1891 |
Land is potentially contaminated, site was used for:Unknown Filled Ground (Pit, quarry etc), Is ranked:MEDIUM, Year:1987 |
USRN: 27505386 Road Class:YFP Ownership: Highway Authority |
Within Flood Zone 3 |
Within:, SSSI 500M Buffer in North Devon,consider need for AQIA if proposal is for anaerobic digester without combustion plant |
Within:, SSSI 5KM Buffer in North Devon (Exmoor NP),consider need for AQIA if proposal is for anaerobic digester without combustion plant |
Within:, SSSI 5KM Buffer in North Devon,consider need for AQIA if proposal is for anaerobic digester without combustion plant |
Site of Special Scientific Interest: Napp's Cave |
SSSI Impact Risk Consultation Requirement:ALL PLANNING APPLICATIONS.,Infrastucture:,Wind/Solar:,Minerals/Oil/Gas:, Rural Non Residential:,Residential:,Rural Residential:,Air Pollution:,Combustion:,Waste:,Compost:,Water Supply |
SSSI Impact Risk Consultation Requirement:,Infrastucture:Pipelines, pylons and overhead cables. Any transport proposal including road, rail and by water (excluding routine maintenance). Airports, helipads and other aviation proposals.,Wind/Solar:Solar schemes with footprint > 0.5ha, all wind turbines.,Minerals/Oil/Gas:Planning applications for quarries, including: new proposals, Review of Minerals Permissions (ROMP), extensions, variations to conditions etc. Oil & gas exploration/extraction., Rural Non Residential:Large non residential developments outside existing settlements/urban areas where footprint exceeds 1ha.,Residential:Residential development of 50 units or more.,Rural Residential:Any residential development of 50 or more houses outside existing settlements/urban areas.,Air Pollution:,Combustion:General combustion processes >20MW energy input. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion.,Waste:Landfill. Incl: inert landfill, non-hazardous landfill, hazardous landfill.,Compost:Any composting proposal with more than 75000 tonnes maximum annual operational throughput. Incl: open windrow composting, in-vessel composting, anaerobic digestion, other waste management.,Water Supply |
Within Surface Water 1 in 30 |
Within Surface Water 1 in 100 |
Within Surface Water 1 in 1000 |
Tree Preservation Order: 1 - W1, Berrynarbour |
Tree Preservation Order: 1 - W2, Berrynarbour |
Tree Preservation Order: 1 - W4, Berrynarbour |
Within Adopted AONB (ST09 & ST14) |
Within Adopted Coast and Estuary Zone |
Within 100m of Adopted Heritage Coast |
Within Adopted Unesco Biosphere Transition (ST14) |
Class III Road |