In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy.
This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.
Constraints List |
Within:, SSSI 500M Buffer in North Devon,consider need for AQIA if proposal is for anaerobic digester without combustion plant |
Planning Officer Area: South Team |
County Highway Development Officer:Paul Young email:paul.young@devon.gov.uk |
Advert Control Area Area of Special Advert Control |
Landscape Character is: 3A Upper Farmed & Wooded Valley Slopes |
Burrington Radar Safeguard Area consultation required for: All buildings, structures, erections & works exceeding 15 metres in height. |
Chivenor Safeguard Zone Consultation Structure or works exceeding 15.2m |
Within:Braunton Burrows, SAC 10KM Buffer if agricultural development consider need for AQIA |
Critical Drainage Area |
Within:, SSSI 5KM Buffer in North Devon,consider need for AQIA if proposal is for anaerobic digester without combustion plant |
SSSI Impact Risk Consultation Requirement:All planning applications (except householder) outside or extending outside existing settlements/urban areas affecting greenspace, farmland, semi natural habitats or landscape features such as trees, hedges, streams, rural buildings/structures.,Infrastucture:Pipelines, pylons and overhead cables. Any transport proposal including road, rail and by water (excluding routine maintenance). Airports, helipads and other aviation proposals.,Wind/Solar:Solar schemes with footprint > 0.5ha, all wind turbines.,Minerals/Oil/Gas:Planning applications for quarries, including: new proposals, Review of Minerals Permissions (ROMP), extensions, variations to conditions etc. Oil & gas exploration/extraction., Rural Non Residential:,Residential:Residential development of 50 units or more.,Rural Residential:Any residential developments outside of existing settlements/urban areas with a total net gain in residential units.,Air Pollution:,Combustion:General combustion processes >50MW energy input. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion.,Waste:Landfill. Incl: inert landfill, non-hazardous landfill, hazardous landfill.,Compost:,Water SupplyAny discharge of water or liquid waste that is discharged to ground (ie to seep away) or to surface water, such as a beck or stream (NB this does not include discharges to mains sewer which are unlikely to pose a risk at this location). |
SSSI Impact Risk Consultation Requirement:All planning applications (except householder) outside or extending outside existing settlements/urban areas affecting greenspace, farmland, semi natural habitats or landscape features such as trees, hedges, streams, rural buildings/structures.,Infrastucture:Pipelines, pylons and overhead cables. Any transport proposal including road, rail and by water (excluding routine maintenance). Airports, helipads and other aviation proposals.,Wind/Solar:Solar schemes with footprint > 0.5ha, all wind turbines.,Minerals/Oil/Gas:Planning applications for quarries, including: new proposals, Review of Minerals Permissions (ROMP), extensions, variations to conditions etc. Oil & gas exploration/extraction., Rural Non Residential:,Residential:Residential development of 50 units or more.,Rural Residential:Any residential developments outside of existing settlements/urban areas with a total net gain in residential units.,Air Pollution:,Combustion:General combustion processes >50MW energy input. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion.,Waste:Landfill. Incl: inert landfill, non-hazardous landfill, hazardous landfill.,Compost:,Water Supply |
Within adopted Development Boundary: Fremington Development Boundary ST07 |
Within Adopted Unesco Biosphere Transition (ST14) |
Within Braunton Burrows Zone of Influence |