Skip to content

Welcome to North Devon Council


Application Number

71455

Status

Decision Refused


Sign up to notifications on this planning application Back to search results New search

Planning Online Status


  • Application
    Valid
    12/05/2020
  • Consultation
    End
    19/06/2020
  • Committee
    Meeting
    N/A
  • Decision

    Refused
  • Decision
    Date
    16/02/2022
  • Appeal
    Started
    N/A
  • Appeal
    Decision
    N/A

Summary
Application Number 71455
Location Address Storage Building North side Hudley Mill Hill Charles Nr Brayford Devon
Proposal Application for a lawful development certificate for a proposed installation of new hard standings around the building in association with the storage use together with addition of windows and the increase of the height to the current building to allow for better / additional storage within the building
Status Refused
Application Type Certificate of Lawful Development
Appeal Decision N/A

Important Dates
Application Received Date 20/04/2020
Application Valid Date 12/05/2020
Consultation Start Date 29/05/2020
Site Visited / Site Notice Date
Consultation End 19/06/2020
Advert Expiry
Committee Date (if applicable)
Committee Agenda
Expiry Date 07/07/2020
Decision Date 16/02/2022

Further Information
Expected Decision Level Delegated
Case Officer Miss S. May
Parish BRAYFORD
Ward NORTH MOLTON
Applicant Name Valandea Ltd
Agent Name Valandea Ltd
Agent Address FAO Mr Damian Pope Corylus New Road Teignmouth Devon TQ14 8UD

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.


Document Download Tips

  • To download documents, tick the boxes relating to the documents you wish to view and click the Download Selected Files button.
  • If you wish to download ALL documents place a tick in the box in the header row and this will select all files in the grid.
  • Note: some devices such as iPads that use iOS browsers do not have the standard capability to download multiple files as a default function. If you are experiencing difficulties you may need to download a free application to enable you to extract from zip files.
File Date Description File Size Drawing/Rev Number
Decision Notice
Submitted Plans
Documents and Reports

Consultation Responses

Neighbour List


In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.


No associated neighbours

Consultee List


Name Organisation Sent Reply Due Reply Received
DCC - Development Management Highways DCC - Development Management Highways 17/11/2021
DCC - Development Management Highways DCC - Development Management Highways 29/05/2020 19/06/2020 06/07/2020
Legal Services Legal Services 29/05/2020 19/06/2020 03/07/2020

Constraints List


Constraints List
Unclassified Road
Planning Officer Area: South Team
Advert Control Area Area of Special Advert Control
County Highway Development Officer:Paul Young email:paul.young@devon.gov.uk
Landscape Character is: 2D Moorland Edge Slopes
Minerals and Waste Consultation Zone: Mineral Safeguarding Zone
Burrington Radar Safeguard Area consultation required for: All buildings, structures, erections & works exceeding 90 metres in height.
SSSI Impact Risk Consultation Requirement:,Infrastucture:Airports, helipads and other aviation proposals.,Wind/Solar:,Minerals/Oil/Gas:, Rural Non Residential:,Residential:,Rural Residential:,Air Pollution:,Combustion:General combustion processes >50MW energy input. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion.,Waste:,Compost:,Water Supply
Within Adopted Mineral Conservation Area
Within Adopted Unesco Biosphere Transition (ST14)
No associated appeals