In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy.
This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.
Name |
Address |
Sent |
Reply Received |
Owner/Occupier |
10 Pixie Dell
Braunton
Devon
EX33 1DP |
15/05/2020 |
|
Owner/Occupier |
12 Pixie Dell
Braunton
Devon
EX33 1DP |
15/05/2020 |
|
Owner/Occupier |
14 Pixie Dell
Braunton
Devon
EX33 1DP |
15/05/2020 |
|
Owner/Occupier |
15 Homer Road
Braunton
Devon
EX33 1DS |
15/05/2020 |
|
Owner/Occupier |
16 Pixie Dell
Braunton
Devon
EX33 1DP |
15/05/2020 |
|
Owner/Occupier |
17 Homer Road
Braunton
Devon
EX33 1DS |
15/05/2020 |
|
Owner/Occupier |
18 Pixie Dell
Braunton
Devon
EX33 1DP |
15/05/2020 |
|
Owner/Occupier |
19 Homer Road
Braunton
Devon
EX33 1DS |
15/05/2020 |
|
Owner/Occupier |
20 Pixie Dell
Braunton
Devon
EX33 1DP |
15/05/2020 |
|
Owner/Occupier |
24 Pixie Dell
Braunton
Devon
EX33 1DP |
15/05/2020 |
|
Owner/Occupier |
26 Pixie Dell
Braunton
Devon
EX33 1DP |
15/05/2020 |
|
Constraints List |
Advert Control Area Area of Special Advert Control |
County Highway Development Officer:Paul Young email:paul.young@devon.gov.uk |
Landscape Character is: 7 Main Cities and Towns |
Chivenor Safeguard Zone Consultation Structure or works exceeding 15.2m |
SSSI Impact Risk Consultation Requirement:All planning applications (except householder) outside or extending outside existing settlements/urban areas affecting greenspace, farmland, semi natural habitats or landscape features such as trees, hedges, streams, rural buildings/structures.,Infrastucture:Pipelines, pylons and overhead cables. Any transport proposal including road, rail and by water (excluding routine maintenance). Airports, helipads and other aviation proposals.,Wind/Solar:Solar schemes with footprint > 0.5ha, all wind turbines.,Minerals/Oil/Gas:Planning applications for quarries, including: new proposals, Review of Minerals Permissions (ROMP), extensions, variations to conditions etc. Oil & gas exploration/extraction., Rural Non Residential:,Residential:Residential development of 50 units or more.,Rural Residential:Any residential development of 10 or more houses outside existing settlements/urban areas.,Air Pollution:,Combustion:General combustion processes >20MW energy input. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion.,Waste:Landfill. Incl: inert landfill, non-hazardous landfill, hazardous landfill.,Compost:Any composting proposal with more than 500 tonnes maximum annual operational throughput. Incl: open windrow composting, in-vessel composting, anaerobic digestion, other waste management.,Water Supply |
SSSI Impact Risk Consultation Requirement:All planning applications (except householder) outside or extending outside existing settlements/urban areas affecting greenspace, farmland, semi natural habitats or landscape features such as trees, hedges, streams, rural buildings/structures.,Infrastucture:Pipelines, pylons and overhead cables. Any transport proposal including road, rail and by water (excluding routine maintenance). Airports, helipads and other aviation proposals.,Wind/Solar:Solar schemes with footprint > 0.5ha, all wind turbines.,Minerals/Oil/Gas:Planning applications for quarries, including: new proposals, Review of Minerals Permissions (ROMP), extensions, variations to conditions etc. Oil & gas exploration/extraction., Rural Non Residential:,Residential:Residential development of 50 units or more.,Rural Residential:Any residential development of 10 or more houses outside existing settlements/urban areas.,Air Pollution:Any development that could cause AIR POLLUTION (incl: industrial/commercial processes, livestock & poultry units, slurry lagoons/manure stores).,Combustion:All general combustion processes. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion.,Waste:Mechanical and biological waste treatment, inert landfill, non-hazardous landfill, hazardous landfill, household civic amenity recycling facilities construction, demolition and excavation waste, other waste management.,Compost:Any composting proposal. Incl: open windrow composting, in-vessel composting, anaerobic digestion, other waste management.,Water SupplyAny discharge of water or liquid waste that is discharged to ground (ie to seep away) or to surface water, such as a beck or stream (NB this does not include discharges to mains sewer which are unlikely to pose a risk at this location). |
Within Adopted Coast and Estuary Zone |
Within adopted Development Boundary: Braunton Development Boundary ST07 |
Within Adopted Unesco Biosphere Transition (ST14) |
Within Braunton Burrows Zone of Influence |