Skip to content

Welcome to North Devon Council


Application Number

71426

Status

Decision Approved


Sign up to notifications on this planning application Back to search results New search

Planning Online Status


  • Application
    Valid
    28/05/2020
  • Consultation
    End
    28/09/2020
  • Committee
    Meeting
    N/A
  • Decision

    Approved
  • Decision
    Date
    01/10/2020
  • Appeal
    Started
    N/A
  • Appeal
    Decision
    N/A

Summary
Application Number 71426
Location Address Mill Park Touring Site Mill Lane Berrynarbor Ilfracombe Devon EX34 9SH
Proposal Construction of fifteen hardstanding pitches together with installation of electrical hook-up points, drinking water taps and waste water disposal points (Bottom Field)
Status Approved
Application Type Full Application
Appeal Decision N/A

Important Dates
Application Received Date 09/04/2020
Application Valid Date 28/05/2020
Consultation Start Date 07/09/2020
Site Visited / Site Notice Date
Consultation End 28/09/2020
Advert Expiry 25/06/2020
Committee Date (if applicable)
Committee Agenda
Expiry Date 02/10/2020
Decision Date 01/10/2020

Further Information
Expected Decision Level Delegated
Case Officer Mrs J. Meakins
Parish BERRYNARBOR
Ward MARWOOD
Applicant Name Mill Park Limited
Agent Name Stephens Scown LLP
Agent Address FAO Ms Sarah-Jane Williams Osprey House Malpas Road TRURO Cornwall TR1 1UT

Copyright Notice

Plans, drawings and material submitted to the council are protected by the copyright acts (section 47, 1988 act). You may only use material which is downloaded and/or printed for consultation purposes, to compare current applications with previous schemes and to check whether developments have been completed in accordance with approved plans. Further copies must not be made without the prior permission of the copyright owner.

Tick here to show you have read and agree with the Copyright Notice.


Document Download Tips

  • To download documents, tick the boxes relating to the documents you wish to view and click the Download Selected Files button.
  • If you wish to download ALL documents place a tick in the box in the header row and this will select all files in the grid.
  • Note: some devices such as iPads that use iOS browsers do not have the standard capability to download multiple files as a default function. If you are experiencing difficulties you may need to download a free application to enable you to extract from zip files.
File Date Description File Size Drawing/Rev Number
Letters of Representation
Decision Notice
Submitted Plans
Documents and Reports
Consultation Responses

Consultation Responses

Neighbour List


In addition to consultations with the consultee listed, we will publicise the application in accordance with national requirements and our local policy. This publicity usually takes the form of letters to nearby properties, the posting of site notices and/or the placing of a public notice in our local newspapers.


Name Address Sent Reply Received
lesley snell 16 HAGGINTON HILL BERRYNARBOR ILFRACOMBE DEVON EX34 9SB 29/06/2020
M W Joyce 14 Hagginton Hill Berrynarbor Ilfracombe EX34 9SB 29/06/2020
M.Joyce 14 BESSHILL HAGGINTON HILL BERRYNARBOR ILFRACOMBE DEVON EX34 9SB 30/06/2020
Richard Annear 35 BEACH ROAD HELE BAY ILFRACOMBE DEVON EX34 9QZ 23/06/2020
Sheila Chatterton SLOLEY COTTAGE BERRYNARBOR ILFRACOMBE DEVON EX34 9SX 30/06/2020
Owner/Occupier Ding Dong Berrynarbor Ilfracombe Devon EX34 9SJ 03/06/2020
Owner/Occupier Sawmill Cottage The Old Sawmill Inn Berrynarbor Ilfracombe Devon EX34 9SX 03/06/2020
Owner/Occupier The Old Sawmill Inn Berrynarbor Ilfracombe Devon EX34 9SX 03/06/2020
Owner/Occupier Watermouth Cottage Berrynarbor Ilfracombe Devon EX34 9SJ 03/06/2020
Owner/Occupier Watermouth House Berrynarbor Ilfracombe Devon EX34 9SJ 03/06/2020
Owner/Occupier Watermouth House Cottage Berrynarbor Ilfracombe Devon EX34 9SJ 03/06/2020

Consultee List


Name Organisation Sent Reply Due Reply Received
Sustainability Officer Sustainability Officer 14/07/2020
Berrynarbor Parish Council Berrynarbor Parish Council 03/06/2020 24/06/2020 12/06/2020
Councillor F Tucker Councillor F Tucker 03/06/2020 01/07/2020
Environmental Health Manager Environmental Health Manager 03/06/2020 24/06/2020 11/06/2020
Environment Agency Environment Agency 20/07/2020 10/08/2020 12/08/2020
North Devon AONB Service North Devon AONB Service 20/07/2020 10/08/2020 25/06/2020
Berrynarbor Parish Council Berrynarbor Parish Council 07/09/2020 21/09/2020
Councillor F Tucker Councillor F Tucker 07/09/2020 21/09/2020
Environment Agency Environment Agency 07/09/2020 21/09/2020 12/08/2020
Environmental Health Manager Environmental Health Manager 07/09/2020 21/09/2020 16/09/2020
North Devon AONB Service North Devon AONB Service 07/09/2020 21/09/2020 11/09/2020
Sustainability Officer Sustainability Officer 07/09/2020 28/09/2020 08/09/2020

Constraints List


Constraints List
Class I Road
Class III Road
Unclassified Road
Planning Officer Area: North Team
Historic Landfill Buffer
County Highway Development Officer:Paul Young email:paul.young@devon.gov.uk
Within Flood Zone 2
Within Flood Zone 3
Landscape Character is: 4C Coastal Slopes and Combes with Settlement
Advert Control Area Area of Special Advert Control
Article 4 Area: Combe Martin and Berrynarbor
Chivenor Safeguard Zone Consultation Structure or works exceeding 91.4m
SSSI Impact Risk Consultation Requirement:,Infrastucture:Pipelines, pylons and overhead cables. Any transport proposal including road, rail and by water (excluding routine maintenance). Airports, helipads and other aviation proposals.,Wind/Solar:Solar schemes with footprint > 0.5ha, all wind turbines.,Minerals/Oil/Gas:Planning applications for quarries, including: new proposals, Review of Minerals Permissions (ROMP), extensions, variations to conditions etc. Oil & gas exploration/extraction., Rural Non Residential:Large non residential developments outside existing settlements/urban areas where footprint exceeds 1ha.,Residential:Residential development of 50 units or more.,Rural Residential:Any residential development of 50 or more houses outside existing settlements/urban areas.,Air Pollution:,Combustion:General combustion processes >20MW energy input. Incl: energy from waste incineration, other incineration, landfill gas generation plant, pyrolysis/gasification, anaerobic digestion, sewage treatment works, other incineration/ combustion.,Waste:Landfill. Incl: inert landfill, non-hazardous landfill, hazardous landfill.,Compost:Any composting proposal with more than 75000 tonnes maximum annual operational throughput. Incl: open windrow composting, in-vessel composting, anaerobic digestion, other waste management.,Water Supply
Within Adopted AONB (ST09 & ST14)
Within Adopted Coast and Estuary Zone
Within 100m of Adopted Heritage Coast
Within Adopted Unesco Biosphere Transition (ST14)
Flood Zone 1 - majority of site
No associated appeals